Simulations by Guangzhou Municipal Engineering Design and Research Institute (GMEDRI) with Far East Mobility, based on current traffic volumes and shown at double speed.

Hledan (Pyay/Insein intersection) - view 1

Hledan (Pyay/Insein intersection) - view 2

Hanthawady Roundabout at current traffic volumes (6x speed)

Hanthawady Roundabout at current traffic volumes plus 30% (6x speed)

Hanthawady simulations were updated in December 2018 to show a continuous three lanes south to north from the roundabout to the start of the Hledan flyover, and a pedestrian bridge at Seik Pyo Yay station immediately north of the roundabout. A version with 30% higher flows on all approaches was also added.