Peshawar, Pakistan


Project Name: Peshawar BRT Concept Design Study

Duration
June 2016 to July 2016
Client
Desmobi / ITDP- Indonesia, under Asian Development Bank
Project Features
With ADB loan funding and technical support, Peshawar was planning a major BRT project (opened for operation in 2020), with many of the key project design parameters establishing during the Concept Design stages in 2016.
Far East Mobility Role
Far East Mobility provided a short but influential input to the Peshawar BRT concept design stage (part of an ADB project), leading to significant revisions to the proposed BRT roadway and intersection design, the BRT corridor selection, aspects of the BRT station architecture, the incorporation of NMT facilities, and the BRT operations and route selection. The demand analysis and substop calculation was also significantly adjusted.
Updated: 28/12/2020