Guangzhou and Yichang BRT site visits and training

Of all the capacity-building activities that could be undertaken for people involved in BRT planning, probably the single most useful and influential is to visit the most successful BRT systems in Asia, and hear directly from the key planners and designers of the systems. Far East Mobility's site visit program provides this opportunity. Most popular are the half day and one day site visit programs. Costs are listed here.

Far East Mobility hosts site visit and technical briefing programs for key demonstration projects in urban transport and urban development.

Guangzhou links

Yichang links

Guangzhou BRT

The Guangzhou BRT is introduced here.

The Guangzhou BRT was the first very high capacity BRT in Asia and with a peak passenger throughput of around 25,000 passengers per hour per direction (pphpd) is still the only system in Asia to exceed 10,000 pphpd. Some key points include:

  • Peak passenger flows of around 25,000 pphpd. This is far in excess of capacity limits formerly thought to apply to 'direct-service' BRT systems in which vehicles operate both inside and outside the BRT infrastructure, avoiding passenger transfers, and is more than double the throughput of the next highest system in Asia (Xiamen, with 9,850 pphpd).
  • Daily ridership of more than 800,000 passenger-trips.
  • Passenger boardings of 8,000 passengers per hour (not including transfers) at the biggest morning peak and evening peak stations.
  • Some of the world's longest BRT stations and the highest BRT bus volumes: 240-300 per hour in a single direction, or roughly 1 bus every 12-15 seconds in a single direction.
  • Direct connecting tunnels between metro and BRT stations. Inter-modal connections (BRT, metro, bike sharing, bike parking, pedestrians, adjacent buildings) make the Guangzhou BRT corridor a leading example of multi-modal transport integration.
  • The only BRT system in China with more than one BRT operator: three corporate groups consisting of seven different bus operating companies all operate BRT routes.
  • The first BRT system in Asia to determine station size based on passenger demand, for all stations. This results in a range of station lengths from 55m to more than 250m.

An impact analysis carried out during 2009-2015 reveals a range of impressive impacts of the Guangzhou BRT:

  • 30% higher bus speeds, resulting in an average time saving of 6.63 minutes per BRT trip, or 88,000 passenger-hours per day, or more than 30 million passenger-hours saved each year.
  • A halving of out-of-pocket bus trip costs for passengers, from 4.9 yuan (December 2009) to 2.6 yuan (August 2010). Operational losses (revenue minus costs) per bus-km fell from 0.9 yuan (before BRT) to 0.3 yuan.
  • A 15% decrease in bus waiting times along the BRT corridor, compared to a 7% increase in another (non-BRT) corridor, done as a control survey.
  • In the BRT corridor, an increase in those satisfied with public transport from 29% (Dec. 2009, before the BRT) to 65% (Dec. 2010), and a decrease in those dissatisfied with public transport from 21% (Dec. 2009) to 2% (Dec. 2010) (see this article on passenger satisfaction, and this article on reliability).
  • A large increase in civic pride, with those agreeing 'I am proud of Guangzhou' increasing amongst bus passengers in the BRT corridor from 40% (before the BRT) to 73%. Amongst car drivers the figure was unchanged, and in the control survey in a different corridor, civic pride amongst bus passengers decreased slightly over the same period.
  • An increase in bus passengers agreeing that 'the environment in Zhongshan Avenue [the BRT corridor] is good', from 17% (before BRT) to 67% (after BRT). Those who disagreed fell from 52% to 9%.
  • An increase in those agreeing that 'I feel safe walking along Zhongshan Avenue' from 28% before the BRT to 68% after BRT (see article). An increase in cyclists along the BRT corridor by 50% in the highest demand locations, within the first year (see article).
  • Significantly lesser greenhouse gas and local emissions, with faster and smoother traffic, and fewer and newer buses. More than 50,000 tons of CO2 emissions were reduced in the first year of operation due to fewer bus-kilometers, faster and smoother traffic, and mode shift from cars and taxis to buses. The first BRT corridor will average 84,000 tons of CO2 emission reductions per year over the first 10 years of the project.

The Guangzhou BRT and integrated bike sharing system won the 2011 Sustainable Transport Award in a ceremony in Washington DC on 24 January 2011. The BRT system has also been awarded city and provincial first level design prizes, and was acknowledged as a UNFCCC 'Lighthouse Award' recipient in 2013. Also in 2013 the Guangzhou BRT was the first BRT system in Asia to receive a 'Gold Standard' rating in the BRT Standard scoring system.

Yichang BRT

The Guangzhou Modern BRT and Sustainable Transport Institute, led by Far East Mobility experts working for ITDP, in 2012 won an international bid by the Asian Development Bank to provide the BRT preliminary design in Yichang, the second largest city in Hubei Province after Wuhan, and the site of the Three Gorges Dam. This major project features a BRT corridor through the city, and Far East Mobility experts (working at the time for GMEDRI and ITDP-China) led the preliminary corridor design, demand analysis, operations, station and road design, modal integration plan (focusing on pedestrians & bicycles), and other system features. The construction of the Yichang BRT started in February 2014. The system opened on 15 July 2015. The full phase 1 and 2 corridors run 23.9 kilometers with 37 stations connecting major urban sub-centres in the north and south of the city. A preliminary impact analysis is available here.


Yichang Vice Mayor with one of Far East Mobility's site visit guides, Chief Engineer of the Guangzhou BRT Xiaomei Duan.
Lanzhou Party Secretary and Mayor
Synergos delegation visits Guangzhou BRT in October 2014


Metro Manila delegation
Asian Development Bank delegation from 2013
Visit to Shaipaiqiao BRT metro-BRT connecting tunnel, under construction in September 2010
Asian Development Bank delegation from 2012

Typical half-day program

8.45-9.15am Gather on Gangding BRT station main bridge.
Gangding BRT station has 9,000 passenger alightings per hour at this station during the morning peak.
Note various design features, location relative to intersection, distribution of waiting passengers inside the station, substops and overaking lanes, allocation of routes to substops, station operation, aspects of station design, sliding doors, fare collection and ITS elements, etc.
9.15-9.45am Huajing Xincheng BRT station and integrated bike sharing.
Briefing on the bike sharing system, implemented as part of the BRT system in 2010.
Ride to Xueyuan BRT station with bike sharing system bikes, along segregated bike lanes implemented as part of the BRT project.
9.45-10.30am Tangxia BRT station and urban village, walking to Tangdong BRT station.
Huge passenger demand at Tangxia station, with more than 8,500 boarding passengers per hour during the morning peak.
See BRT corridor access & station area improvements at Tangdong.
Note hHigh density modern development on opposite side of the corridor, at Junjing Huayuan.
10.40-11.00am Dongpu BRT station.
At-grade access at both ends, and observe innovative intersection design combined with station access.
Observe the direct service BRT routes, from a nearby rooftop. Direct service routes enter and leave the corridor in all directions from this station.
11.20am-12.00pm Shipaiqiao BRT station. See BRT-metro-mall connection.
Liuyuan Xiaoqu neighborhood (photos)
12.00pm Lunch

Typical one-day program

8.45-9.15am Gather on Gangding BRT station main bridge.
Gangding BRT station has 9,000 passenger alightings per hour at this station during the morning peak.
Note various design features, location relative to intersection, distribution of waiting passengers inside the station, substops and overaking lanes, allocation of routes to substops, station operation, aspects of station design, sliding doors, fare collection and ITS elements, etc.
9.15-9.45am Huajing Xincheng BRT station and integrated bike sharing.
Briefing on the bike sharing system, implemented as part of the BRT system in 2010.
Ride to Xueyuan BRT station with bike sharing system bikes, along segregated bike lanes implemented as part of the BRT project.
9.45-10.30am Tangxia BRT station and urban village, walking to Tangdong BRT station.
Huge passenger demand at Tangxia station, with more than 8,500 boarding passengers per hour during the morning peak.
See BRT corridor access & station area improvements at Tangdong.
Note hHigh density modern development on opposite side of the corridor, at Junjing Huayuan.
11.00-11.30am BRT Control Centre, including on-site briefing
12.00-12.20pm Dongpu BRT station.
At-grade access at both ends, and observe innovative intersection design combined with station access.
Observe the direct service BRT routes, from a nearby rooftop. Direct service routes enter and leave the corridor in all directions from this station.
12.20-2.00pm Lunch
2.10-3.00pm Shipaiqiao BRT station. See BRT-metro-mall connection.
Liuyuan Xiaoqu neighborhood (photos)
3.30-4.00pm Donghaochong greenway, from Wanfu Park to Xiaobei
See photos
4.20-6.00pm Technical briefings & presentations at Far East Mobility office.
- Guangzhou BRT design, planning, implementation, and operation.
- Overview of BRT developments in China & Asia.
- Bike sharing & BRT integration
- Greenways
- Parking best practices
6.30-6.45pm Gangding evening peak site visit.
Around 9,000 boarding passengers per hour, with huge bus and passenger flows. Note passenger distribution & substop operation.

Costs

Cost per city for programs with up to 10 participants are:

0.5 day program, $1,450 Please contact us regarding payment
1 day program, $2,950 Please contact us regarding payment
1.5 day program, $3,950 Please contact us regarding availability
2 day program, $5,950 Please contact us regarding availability

For each additional person in excess of 10 people the costs per person per city are:

  • 0.5 day program, $145
  • 1 day program, $295
  • 1.5 day program, $395
  • 2 day program, $595.

The program fee includes:

  • Site visit & technical introduction on site (including BRT fares, bike sharing ride)
  • Technical presentation from Far East Mobility experts and/or local agency (BRT Management Company, Guangzhou Muncipical Engineering Design Institute and/or Communications Commission department), except for the half day program, where only on-site briefings will be provided
  • Digital copies of presentation materials

Prospective participants need to confirm Far East Mobility's availability to carry out any programs.

Higher cost options are possible, subject to Far East Mobility's availability, including for example formal course certificates, additional invited presenters, mobilization of more Far East Mobility and other personnel during the site visits and training, printed support materials, inclusion of meals, and so on.

The Yichang costs are the same, except that in Yichang the travel & hotel costs of two Far East Mobility staff members will also need to be included.